Detours and updates

Updated: 9.25.17 8:01 AM

Real-time traffic

No disruption

Notifications

Network Line Start End Remarks Description
2


6


11


21.08.2017
31.12.2017
Engineering works
Stop not served
  • Fribourg, Beauregard

Remplacement stop: Fribourg, gare (Line 11)

Remplacement stop: Fribourg, gare CFF (Lines 2 and 6)

Connections are not guaranted.

 

3


5


30.09.2017 12:00
30.09.20107 20:00
Event
Stop not served
  • Place Georges Python

Replacement stop: St-Pierre

Connections are not guaranteed.

1


08.09.2017 17:00
05.03.2018 23:00
Event, each match at home
Stops not served
  • Poya

Temporary stop: "Route de Grandfey"

  • Stade-Patinoire

Replacement stop: Cimetière

Connections are not guaranteed.

8


21.08.2017
31.12.2017
Engineering works
Stops not served
  • Givisiez, rte du Bleuet

Temporary stop: rte André Piller

  • Givisiez, rte des Fluides

Temporary stop: à 100 m

Connections are not guaranteed.

2


6


11


11.07.2017
20.12.2017
Engineering works
Possible delays

Please allow for possible delays.

Connections are not guaranteed.

5


02.11.2016
29.06.2018
Engineering works
Stop not served
  • Nuithonie

Replacement stop: Cormanon

S20
S21
21.08.2017
09.12.2017
Engineering works
New station
  • Münchenwiler-Courgevaux

Please use only the platform 2.

01.10.2017 05:00
01.10.2017 16:00
Event
Lines diverted and stops not served

Lines diverted:

  • Agglo 1, 2, 3, 5 and 6
  • Regio 123, 127 and 181

Stops not served:

  • St-Pierre
  • Place Georges Python
  • Tilleul
  • Bourg
  • Chancellerie
  • Pont-Zaehringen
  • Stadtberg
  • Capucins
  • Poya
  • Stade-Patinoire
  • Cimetière
  • Portes-de-Fribourg

Please allow for a longer travelling time.

Connections are not guaranteed.

18.09.2017
30.09.2017
Engineering works
Interruption
  • Funicular

Annual revision 2017

More information (french only)

N3
361


21.08.2017
31.12.2017
Engineering works
Stop not served
  • Fribourg, Beauregard

Replacement stop: Fribourg, gare

Connections are not guaranted.
N3
361


11.07.2017
20.12.2017
Engineering works
Possible delays

Please allow for possible delays.

Connections are not guaranteed.

N4
02.11.2016
29.06.2018
Engineering works
Stop not served
  • Nuithonie

Replacement stop: Cormanon

556


28.09.2017 05:00
29.09.2017 06:00
Engineering works
Stops not served
  • St-Aubin FR, bif.

Replacement stop: St-Aubin FR, bif. (giratoire)

  • Missy, nord

Replacement stop: Missy, village

Connections are not guaranteed.

556


28.09.2017 05:00
29.09.2017 06:00
Engineering works
Modified timetable
  • Missy, village

All departures for Domdidier are advanced to 10 minutes !

All departures for Grandcour are delayed to 13 minutes !

Connections are not guaranteed.

492


25.09.2017 12:30
25.09.2017 20:00
Engineering works
Stop not served
  • Châtel-St-Denis, Fruence

Replacement stop: Châtel-St-Denis, Pontille

Connections are not guaranteed.

120


182


17.07.2017
Permanent
New bus stops
Moved stopping point
  • Schmitten FR, Bahnhof

New stopping point

  • Schmitten FR, Schlossmatte

New stopping point (--> Fribourg)

213


20.02.2017
31.10.2017
Engineering works
Possible delays

Please allow for a longer travelling time.

Connections are not guaranteed.

Real-time traffic - disruption - Notifications